Apps → Maintenance → /apps/maintenance Beta
Maintenance puts everything about keeping a property in repair on one sidebar. Today shows what needs someone now. Requests are what residents and staff reported. Work orders are the jobs you raise to fix things, followed through to a signed-off final cost. Preventive and Assets hold what you service on a schedule and the equipment you own.
a request comes in → triage it → raise a work order → do the work → mark it done → sign off the final cost and who pays it
The sidebar
| Section | Page | What it is |
|---|---|---|
| — | Today | What needs you now, for the property you are in. |
| Work | Requests | Every service request, with a count of new ones waiting for triage. |
| Work | Work orders | The jobs being done, with a count of open ones. |
| Plan | Preventive | Maintenance schedules: what is serviced, and how often. |
| Register | Assets | The asset register, with a Meter Readings tab. |
Everything is for the property selected in the top bar. Change the property there to see another one's requests and jobs.
Who can do what
| A person who can… | Can, in Maintenance |
|---|---|
| View service requests | Open the app, see Today, Requests and Work orders. |
| Mark a service request solved | Also raise work orders, change them and sign them off. |
| View finance | Also see what jobs cost: the Estimate column, the Cost section of a job and the sign-off. They can also open Preventive and Assets, which carry purchase costs and book values. |
Someone who cannot view finance still sees every job, just without any money on it. They cannot sign a job off, because signing off sets the final cost.
Today
Today opens with the date and the property, then a Needs you list. Each line is a count with a button that takes you to the work, for example:
- 32 new requests to triage, the oldest since 7 Apr 2023: Triage
- 8 work orders are past due, 2 of them critical: See work orders
- 8 open work orders have nobody on them: Assign
Below the list are four figures:
| Figure | Counts |
|---|---|
| New requests | Requests nobody has triaged yet, with how many are open in all. |
| Open work orders | Jobs not yet done or cancelled, with how many are with a vendor. |
| Overdue | Open jobs past their due date, with how many of those are critical. |
| Due today | Open jobs due today. |
Overdue and due today lists those jobs, latest due date last, and New requests lists the newest requests. Log a request at the top opens the request form.
Overdue counts days on your property's own calendar, so a job due yesterday is overdue from the start of today where the property is, not where the server is.
Requests
Requests is the same register as Operations → Service requests: the same records, columns and request form. Creating, triaging, assigning and closing requests are described in Service requests.
Work orders
A work order is one job: what needs fixing, where, who is on it, by when, and what it costs.
The list
The list opens on Open: every job not yet done or cancelled. Finished holds done and cancelled jobs. Each row shows:
| Column | Shows |
|---|---|
| Job | What needs fixing, its reference (WO-12) and its priority. |
| Where | The unit, or else the asset, or else the property. |
| With | The vendor or person doing it, or Nobody yet. |
| Due | The due date, and Overdue N days in red when it has passed. |
| Status | Open, Assigned, In progress, On hold, Done or Cancelled. |
| Estimate | What the job is expected to cost. Only shown if you can view finance. |
Search job or reference finds jobs by what they say or by their WO- number. The search runs
when you stop typing; Clear search brings the whole list back. Click a job to open it.
Jobs made before work orders had references have none and show without a WO- number. Every new
job gets the next number for your organisation.
Raise a work order
Open the form
Click New work order on the list, or Raise a work order when the list is empty. The form opens beside the list.
Say what needs fixing
What needs fixing is the only required field: a short title such as Gate motor not closing. Details holds what was seen, where exactly, and anything the person fixing it should know.
Set priority, due date and estimate
Priority is Low, Medium, High or Critical (Medium unless you change it). Due is the day it should be fixed by. Estimate is what you expect it to cost, in the property's currency.
Raise it
Click Raise work order. The job gets its
WO-number, opens, and joins the Open list. Today's figures and the sidebar count include it straight away.
Clicking Raise work order twice, or after a dropped connection, never makes two jobs: the form sends the same job each time.
A job's page
A job's page has three sections:
- The job: what, reference, priority, property, unit, asset, and who it is with.
- When: due, scheduled, started, finished, and when it was raised.
- Cost: the estimate, the final cost, who pays, and whether it is signed off. Only shown if you can view finance.
The top bar shows the way back: Maintenance › Work orders › WO-12.
Change a work order
Click Edit on the job. You can change what needs fixing, the details, the priority, the Status, the due date and the estimate, then Save changes.
The dates in When follow the status. Moving a job to In progress records when it started, and moving it to Done records when it finished.
Sign off
When a job is Done, its page shows Sign off. Enter the Final cost and Who pays it (the owner, the tenant or the company), then click Sign off.
Signed-off and cancelled jobs stay on the Finished tab.
Old links
Assets → Work Orders and any saved link to it now open this list. The jobs on it are the same ones the old grid showed.
Preventive
Preventive is the maintenance schedule register: each asset's recurring service, how often it is due, and when it was last done. It is the same register as Assets → Maintenance Schedules, described in Assets.
Assets
Assets is the asset register, with its Meter Readings tab. It is the same register as Assets → Assets, described in Assets, including purchase cost, book value and depreciation.